Zamin Pouyan Faraz Asia Holding

Dian Copper Mine

MINING LICENSES AND RESOURCES:

MINE NAME

CERTIFICATE TYPE

ISSUANCE DATE

EXPIRY DATE

PROGRESS%

NEXT STEP

DURATION / YEAR

RESERVE

PROVEN/PROBABLE IN TONS

FALAT-E-IRAN CELESTINE / COPPER

PRODUCTION

05/2024

05/3034

100%

RUN THE PROCESSING PLANT

0.5-1

1-2

490,000/650,000

53,000/120,000

DIAN

 PRODUCTION

100%

ONGING PRODUCTION

6

250,000

BADROUD 1to 6

EXPLORATION

70%

PRODUCTION CERTIFICATE

1

800,00/1,200,000

BORNA 1&2

ACQUIRING CLEARANCE LICENSE

80%

EXPLORATION CERTIFICATE

0.5

100,000/150,000

ROBAEI

PRODUCTION

100%

ONGOING 

PRODUCTION

5

950,000

CHAH FARAGH

PRODUCTION CERTIFICATE

80%

EXPLORATION

0.5

1,100,000

ATASHAN

PRODUCTION CERTIFICATE

90%

EXPLORATION

0.25

250,000

DIAN MINE AREA

Dian infrastructures and utilities
Dian crushing benefication plant
Dian 10-30 mm concentrate production line
Dian Infrastructure

PLANT NUMBER ONE IS LOCATED ON DIAN MINE AREA SPECIFICATION AS FOLLOWS:

1. 400 * 400 CM FEEDER
2. 60 * 90 JAW CRUSHER CAPACITY 100 TONS/ HOUR
3. HS120 SECONDARY CRUSHER CAPACITY 40 TONS/HOUR
4.  3 VIBRATING3 STAGES SCREEN OUTPUTS 30-80, 10-30, AND 0 – 10 mm capacity total 60 tons/hour
5. 80 CM WIDTH BELT CONVEYER TOTAL 200 LINEAR METER
6. Washing rotary scrubber capacity 150 tons/hour
7. 2 SCREW ROTARY SAND WASHING CAPACITY 90 TONS PER HOURS

The above crushing BENEFICIATION plant enhances the Celestine grade OVER 90% PURITY and 95% EFFICIENCY

EXPLORATION ACTIVITIES

Row

Item

Volume

Unit

1

Access roads

20.00

Km

2

Exploration Workbenches

2,400

Hour Machine

3

XRF and XRD analysis

30

sample

4

ICP analysis

100

sample

5

Polish Section studies

4.00

sample

6

Pilot tests

200

ton

7

Geochemical studies

132

Hectare

8

Geophysical studies (IP-RS)

1,200

point

9

Core drilling

337

meter

10

Wagon drilling

127

meter

11

Topography and geology map 1/1000

62

Hectare

12

Topography and geology map 1/20000

132

Hectare

13

Chemical analysis

300

sample

TOPOGRAPHY AND GEOLOGICAL MAP

WORK-BENCHES, TRENCHES, BORE-HOLES

Bore-Hole Specifications

BH_ID

UTM Easting

UTM Northing

Z_COLLAR

Total Depth

Inclination

Work

Drilling

 

[m]

[m]

[m]

[m]

[Degree]

Bench

Type

BH1

268,082

3,921,213

1636

33

90

WB-1

Coring

BH2

268,118

3,921,190

1639

21

90

BH3

268,082

3,921,187

1635

42

90

BH4

268,074

3,921,187

1641

38

70

BH1

267,214

3,920,411

1638

38

80

WB-2

BH2

267,194

3,920,384

1636

18

75

BH1

267,345

3,920,302

1636

26

90

WB-3

BH2

267,340

3,920,302

1636

21

80

BH3

267,350

3,920,315

1634

30

90

BH1

266,375

3,922,032

1639

20

90

WB-7

Wagon  Drill

BH2

266,250

3,921,930

1639

18

70

BH3

266,164

3,921,949

1641

16

90

BH4

266,079

3,921,997

 

16

80

Work-Benches / Trenches

WB_ID

UTM Easting

UTM Northing

Length

Width

Height

Target

 

[m]

[m]

[m]

[m]

[m]

 

WB-1

267,233

3,921,037

45

30

3-8

Copper

WB-2

267,212

3,920,211

25

5

3

Copper

WB-3

267,155

3,920,163

15

7

6

Copper

TR-7-1

266,375

3,922,023

10

2

1

Copper

TR-7-2

266,250

3,921,930

10

2

1

Copper

TR-7-3

266,079

3,921,997

10

2

1

Copper

TR-7-4

265,990

3,921,984

10

2

1

Copper

Exploration Holes (Dia.=0.5-1m,
Depth=2-3m)

Hole_ID

UTM Easting

UTM Northing

Sample

 

[m]

[m]

No.

C1

266,958

3,918,610

496-1

C2

267,214

3,920,411

496-2

C3

267,194

3,920,385

496-3

C4

267,322

3,920,307

496-4

C5

267,344

3,920,309

496-5

C6

267,354

3,920,305

496-7

C7

22,437

3,916,503

496-11

C8

266,420

3,916,485

496-8