MINING LICENSES AND RESOURCES:
MINE NAME |
CERTIFICATE TYPE |
ISSUANCE DATE |
EXPIRY DATE |
PROGRESS% |
NEXT STEP |
DURATION / YEAR |
RESERVE PROVEN/PROBABLE IN TONS |
FALAT-E-IRAN CELESTINE / COPPER |
PRODUCTION |
05/2024 |
05/3034 |
100% |
RUN THE PROCESSING PLANT |
0.5-1 1-2 |
490,000/650,000 53,000/120,000 |
DIAN |
PRODUCTION |
100% |
ONGING PRODUCTION |
6 |
250,000 |
||
BADROUD 1to 6 |
EXPLORATION |
70% |
PRODUCTION CERTIFICATE |
1 |
800,00/1,200,000 |
||
BORNA 1&2 |
ACQUIRING CLEARANCE LICENSE |
80% |
EXPLORATION CERTIFICATE |
0.5 |
100,000/150,000 |
||
ROBAEI |
PRODUCTION |
100% |
ONGOING PRODUCTION |
5 |
950,000 |
||
CHAH FARAGH |
PRODUCTION CERTIFICATE |
80% |
EXPLORATION |
0.5 |
1,100,000 |
||
ATASHAN |
PRODUCTION CERTIFICATE |
90% |
EXPLORATION |
0.25 |
250,000 |
DIAN MINE AREA
PLANT NUMBER ONE IS LOCATED ON DIAN MINE AREA SPECIFICATION AS FOLLOWS:
1. 400 * 400 CM FEEDER
2. 60 * 90 JAW CRUSHER CAPACITYÂ 100 TONS/ HOUR
3. HS120 SECONDARY CRUSHER CAPACITY 40 TONS/HOUR
4. 3 VIBRATING3 STAGES SCREEN OUTPUTS 30-80, 10-30, AND 0 – 10 mm capacity total 60 tons/hour
5. 80 CM WIDTH BELT CONVEYER TOTAL 200 LINEAR METER
6. Washing rotary scrubber capacity 150 tons/hour
7. 2 SCREW ROTARY SAND WASHING CAPACITY 90 TONS PER HOURS
The above crushing BENEFICIATION plant enhances the Celestine grade OVER 90% PURITY and 95% EFFICIENCY
EXPLORATION ACTIVITIES
Row | Item | Volume | Unit |
1 | Access roads | 20.00 | Km |
2 | Exploration Workbenches | 2,400 | Hour Machine |
3 | XRF and XRD analysis | 30 | sample |
4 | ICP analysis | 100 | sample |
5 | Polish Section studies | 4.00 | sample |
6 | Pilot tests | 200 | ton |
7 | Geochemical studies | 132 | Hectare |
8 | Geophysical studies (IP-RS) | 1,200 | point |
9 | Core drilling | 337 | meter |
10 | Wagon drilling | 127 | meter |
11 | Topography and geology map 1/1000 | 62 | Hectare |
12 | Topography and geology map 1/20000 | 132 | Hectare |
13 | Chemical analysis | 300 | sample |
TOPOGRAPHY AND GEOLOGICAL MAP

WORK-BENCHES, TRENCHES, BORE-HOLES
Bore-Hole Specifications | |||||||
BH_ID | UTM Easting | UTM Northing | Z_COLLAR | Total Depth | Inclination | Work | Drilling |
 | [m] | [m] | [m] | [m] | [Degree] | Bench | Type |
BH1 | 268,082 | 3,921,213 | 1636 | 33 | 90 | WB-1 | Coring |
BH2 | 268,118 | 3,921,190 | 1639 | 21 | 90 | ||
BH3 | 268,082 | 3,921,187 | 1635 | 42 | 90 | ||
BH4 | 268,074 | 3,921,187 | 1641 | 38 | 70 | ||
BH1 | 267,214 | 3,920,411 | 1638 | 38 | 80 | WB-2 | |
BH2 | 267,194 | 3,920,384 | 1636 | 18 | 75 | ||
BH1 | 267,345 | 3,920,302 | 1636 | 26 | 90 | WB-3 | |
BH2 | 267,340 | 3,920,302 | 1636 | 21 | 80 | ||
BH3 | 267,350 | 3,920,315 | 1634 | 30 | 90 | ||
BH1 | 266,375 | 3,922,032 | 1639 | 20 | 90 | WB-7 | Wagon Drill |
BH2 | 266,250 | 3,921,930 | 1639 | 18 | 70 | ||
BH3 | 266,164 | 3,921,949 | 1641 | 16 | 90 | ||
BH4 | 266,079 | 3,921,997 | Â | 16 | 80 |
Work-Benches / Trenches | ||||||
WB_ID | UTM Easting | UTM Northing | Length | Width | Height | Target |
 | [m] | [m] | [m] | [m] | [m] |  |
WB-1 | 267,233 | 3,921,037 | 45 | 30 | 3-8 | Copper |
WB-2 | 267,212 | 3,920,211 | 25 | 5 | 3 | Copper |
WB-3 | 267,155 | 3,920,163 | 15 | 7 | 6 | Copper |
TR-7-1 | 266,375 | 3,922,023 | 10 | 2 | 1 | Copper |
TR-7-2 | 266,250 | 3,921,930 | 10 | 2 | 1 | Copper |
TR-7-3 | 266,079 | 3,921,997 | 10 | 2 | 1 | Copper |
TR-7-4 | 265,990 | 3,921,984 | 10 | 2 | 1 | Copper |
Exploration Holes (Dia.=0.5-1m,Depth=2-3m) | |||
Hole_ID | UTM Easting | UTM Northing | Sample |
 | [m] | [m] | No. |
C1 | 266,958 | 3,918,610 | 496-1 |
C2 | 267,214 | 3,920,411 | 496-2 |
C3 | 267,194 | 3,920,385 | 496-3 |
C4 | 267,322 | 3,920,307 | 496-4 |
C5 | 267,344 | 3,920,309 | 496-5 |
C6 | 267,354 | 3,920,305 | 496-7 |
C7 | 22,437 | 3,916,503 | 496-11 |
C8 | 266,420 | 3,916,485 | 496-8 |